NVIDIA has decided that the next generation of custom high-bandwidth memory will run on one foundry process, not three.
On October 18, Seoul Economic Daily reported that NVIDIA asked Samsung Electronics, SK hynix and Micron to manufacture the base die of its NVHBM on TSMC’s 3-nanometer process. Samsung accepted after an internal review. The arrangement is the first time Samsung has partnered with TSMC at the HBM manufacturing stage itself. Reuters carried the same print the same day. TrendForce summarized it on October 19.
This is not a routine supplier request. NVHBM, which NVIDIA unveiled in August, moves the memory controller that traditionally sat on the GPU into the base die. The company states that the design delivers up to 30 percent more memory bandwidth, 15 percent lower HBM power consumption and 25 percent more area on the XPU compute die than standard HBM4E. To capture those gains across multiple suppliers, the base die must be identical. Differing process nodes would require separate validation for each memory maker. NVIDIA removed that step by locking the logic layer to TSMC 3nm while standardizing the core DRAM dies on sixth-generation (1c) process technology.
The memory oligopoly has just ceded the critical interface layer. That is the structural point.
The Base Die Is No Longer a Commodity Layer
For years the HBM race was measured in stack height, pin speed and yield on the DRAM cores. Samsung, SK hynix and Micron each controlled both the memory core and the base die that interfaces with the logic die. Samsung’s historical model was pure turnkey: its own foundry produced the base die for its HBM. SK hynix has already used TSMC processes for earlier generations. Micron has moved in the same direction.
NVHBM changes the division of labor. The base die now carries a custom controller designed for consistency across suppliers. Industry estimates cited by Seoul Economic Daily put TSMC’s 3nm yields above 90 percent, while Samsung Foundry’s 2nm (SF2) sits near 60 percent for a design of this complexity. Yield and process maturity, not simply ownership of the DRAM stack, determine whether the bandwidth and power numbers are real across volume.
Samsung is keeping its options open. It continues to use its own 4nm foundry process for the base dies of standard HBM4 (already in mass production) and HBM4E (in validation). Core dies remain on 1c lines at Hwaseong and Pyeongtaek. For other customers, including AMD, Samsung intends to retain the turnkey model. For NVHBM specifically, it is validating whether its own 2nm process can serve as a hedge if TSMC 3nm capacity is exhausted. The hedge itself confirms the constraint has shifted.
TSMC’s 3nm Capacity Is Already Spoken For
TSMC told investors on its October 15 earnings call that 3nm accounted for 33 percent of third-quarter wafer sales, its largest single node. Chairman and CEO C.C. Wei announced another 3nm fab in Tainan on top of expansions already under way in Arizona, Kumamoto and Taiwan’s Southern Taiwan Science Park. The additional Tainan capacity is targeted for mass production in the first half of 2028. Demand continues to exceed supply.
AI accelerators and smartphone chips already compete for the same 3nm wafers. Adding base dies for NVHBM from three memory suppliers increases the allocation pressure. The memory makers cannot simply order more DRAM capacity and declare the bottleneck solved. The interface layer now queues behind the same leading-edge logic capacity that the XPU makers themselves require.
This is the opposite of the narrative that still treats HBM as a pure memory problem. Packaging and hybrid bonding remain tight, but the new print shows that process-node consistency at the base die has become a first-order variable. NVIDIA is not asking the memory suppliers to compete on who can stack the most layers. It is asking them to converge on one foundry process so that performance claims can be verified once, not three times.
What Changes in the AI Compute Stack
The equity market has spent the past week marking down the financing cost of the next layer of AI capacity. That re-pricing is real and visible in credit spreads and in the Nasdaq-100’s internal split. The NVHBM print sits on a different axis. It is a supply-chain decision made before the next capacity add, not a reaction to the cost of the debt used to fund it.
Standardizing the base die on TSMC 3nm raises the probability that the stated 30 percent bandwidth and 15 percent power gains materialize across suppliers. It also concentrates a larger share of the value in the foundry that owns the process and in the company that designed the controller. Memory makers retain the DRAM cores and the stacking know-how, but they no longer fully control the interface that determines how much of the theoretical bandwidth actually reaches the XPU.
Samsung’s dual-track hedge and Micron’s earlier move toward external base dies show the same calculation. Vertical integration remains useful for standard HBM and for non-NVIDIA customers. For the custom product that NVIDIA is trying to make interchangeable, process maturity and validation speed outweigh ownership of every layer.
The residual question is allocation. TSMC’s 3nm is already the largest contributor to its wafer sales and is still capacity-constrained. If NVHBM volumes scale in 2027 as the memory makers and NVIDIA intend, the base-die queue becomes another gate on the same node that the accelerators themselves occupy. That gate is independent of whether the 10-year Treasury yield sits at 5.1 percent or 4.8 percent. It is a physical constraint that the financing discussion does not resolve.
Whether Samsung’s 2nm hedge is ever needed, and whether the three memory suppliers can secure enough 3nm allocation without delaying the bandwidth gains NVIDIA has published, is the open print the supply chain will have to answer. The DRAM cores can still be differentiated. The base die, for this product, has just been standardized.
For the broader financing backdrop that dominated the Nasdaq-100 last week, see our earlier note on how the index priced the cost of capital rather than the end of AI demand.
【Tags】 NVHBM, HBM, TSMC, Samsung, SK hynix, Micron, NVIDIA, AI Compute

Leave a Reply